Help Center
Permissions
- Permission Roles for User and User GroupsYou use roles and their scope to determine who in your organization is authorized to view or edit absences, weekly working hours, and time tracking.
- Permission RolesPermission roles determine which permissions users or groups have, from read-only access to full editing rights. They apply to the current element and are inherited by the elements below it.
- User TypesThe user type determines how a user can work in Octaved Flow and how they are licensed: standard users for internal staff, guest users with limited access, virtual users without login, and API users for system integrations.
Billing
- StatusThe status controls what can happen to a project, sub-project, or work package: Open allows work and time tracking, Suspended pauses it, Approved for final billing signals the billing team, and Closed marks it as finished.
- Billing typesTarget effort or billing types define how a work package's effort is planned, tracked, and billed to the customer, from effort-based types to fixed price, contingent, and free of charge. In simple mode, the target effort or billing type is selected automatically, depending on whether hours are specified or not.
- Default setting for price category per userThe default setting for the price category is specified per user and can be found in the user settings.
Project Controlling
Resource Management
Project Planning
- Planning DependenciesWith a time-based dependency, the successor moves along when the predecessor is moved. With a trigger, the successor starts once the predecessor is done. Both methods can be combined, and only relevant predecessors count towards the planning status.
- Hide Empty Sub ProjectsWhen enabled, sub-projects that contain no work packages, or none that match the current filters, are hidden. This is particularly useful in combination with label filters, for example to only see sub-projects with problems.
General
- LabelsLabels let you mark projects, sub-projects, work packages, and time tracking entries, for example for priorities, workflows, or controlling. Labels are defined centrally.
- Allow File Protocol LinksThis feature lets you open files on drives or drive shares (file:// links) from the link list in the board directly in Windows Explorer. It requires Windows, Microsoft Edge, and some configuration by your Windows administrator.